back Dunnage Air Bags main page.


How to install a Dunnage Air Bag?

 

  • Step 1: Select the correct size and ply bag making sure that the bag covers as much of the face of the load as possible.
  • Step 2: Use appropriate buffer material between the load and the bag making sure that no sharp edges or points can contact the bag.
  • Step 3: Correctly position the bag in the void space with the bag being placed a minimum of one inch above the floor and not extending above the top or sides of the load.
  • Step 4: Attach inflator tip to the valve. Inflate the bag to the recommended air pressure (recommended pressure varies according to product and mode of transportation). Check with air gauge before shipping.
  • Step 5: Deflate bag by puncturing with a sharp instrument.

    Do not slash.


Request a quote for an Ecodek Corrugated Pallet
Request a quote for a Dunnage Air Bag to meet your needs.


Frequently Asked Questions: